2024 onwards

2019

National Partnership for Remote Housing NT

$550 million - Housing and residential

New and upgraded remote housing.

The Northern Territory Government is improving Aboriginal housing in remote communities by investing $1.1 billion from 2016-2017 to 2026-2027 through the Remote Housing Investment Package: Our Community. Our Future. Our Homes.

Milestone:

Project underway

NT Airports Extension

$300 million - Roads and transport

Construction of a cold storage unit and export hub at Darwin International Airport and solar energy farms in Darwin, Alice Springs and Tennant Creek.

The project will expand the Northern Territory’s (NT) agricultural export potential and tourism activity by allowing bigger planes to carry more visitors into the NT, and carry more of the NT’s iconic produce such as mud crabs, barramundi, mangoes and melons to the world.

Jobs: 1,500 jobs

Milestone:

In progress

Our Community. Our Future. Our Home.

$1.1 billion - Housing and residential

New and upgraded remote housing.

The Northern Territory Government is improving Aboriginal housing in remote communities by investing $1.1 billion from 2016-2017 to 2026-2027 through the Remote Housing Investment Package: Our Community. Our Future. Our Homes.

Jobs: $51.1 million awarded to Aboriginal business enterprises to date

Milestone:

10 years ongoing

Public Housing Stimulus

$100 million - Housing and residential

The Department of Local Government, Housing and Community Development is delivering a $100 million public housing stimulus program for the construction and upgrade of public housing dwellings in Alice Springs, Tennant Creek, Darwin, Katherine and Nhulunbuy, which will run through until the end of June 2020.

The program aims to further support local businesses and jobs in the construction industry.

Upgrades, repairs and maintenance work to public housing in Darwin, Palmerston, Nhulunbuy, Katherine, Tennant Creek and Alice Springs is available now.

Milestone:

Commenced

Remote Housing Land Servicing Industry

$426 million - Housing and residential

Supporting housing in remote communities.

In addition to the $1.1 billion Our Community. Our Future. Our Homes. program, $426 million is being invested in land servicing and headworks to increase the serviced lots and related infrastructure to support new houses.

Work includes subdivisions, headworks, and establishing electrical, water and sewerage infrastructure to create new residential housing lots.

Milestone:

Underway

2020

Air Combat Facilities RAAF Base Tindal

$486 million - Defence

New buildings, facilities and aprons to support Joint Strike Fighter at RAAF Base Tindal.

The works will include an F-35A Operational Precinct, warehouse and pavement upgrades, counter measure storage and preparation facilities, engineering infrastructure and replacement of displaced elements.

Milestone:

Construction complete

Air Traffic Control Towers - RAAF Base Darwin and Tindal

$40 million - Defence

New Air Traffic control towers at RAAF Bases Darwin and Tindal.

This project includes construction of two new air traffic control towers, accommodating a control cabin, external observation deck and a crew rest area, toilet, kitchenette and mechanical plant room.

RAAF Base Darwin

Works include a new sensor equipment building, construction of a new air traffic control tower and refurbishment and modifications to the airfield systems complex facilities. The new tower is a 50m high multi-level facility accommodating a control cabin, external observation deck and a crew rest area, toilet, kitchenette and plant room.

RAAF Base Tindal

Works include a new sensor equipment building on the northern side of the base and the construction of a new air traffic control tower and airfield systems complex to accommodate the phase 3 equipment.

The new tower is a 25m high multi-level facility accommodating a control cabin, external observation deck and a crew rest area, toilet, kitchenette and mechanical plant room.

Milestone:

Project underway

Alice Springs Hospital Accommodation

$25 million - Housing and residential

The project comprises 70 new residential units located in a single complex, in close proximity to the Alice Springs Hospital.

Development of a residential precinct in the Alice Springs CBD to help attract and retain professional health staff in Alice Springs.

Jobs: 575 jobs during construction, 100 direct and 465 indirect

Milestone:

Construction commence

Arafura Class Offshore Patrol Vessel Infrastructure - HMAS Coonawarra

$214 million - Defence

New wharf infrastructure to support offshore patrol vessels at HMAS Coonawarra.

The proposed works include upgrades to both existing wharves, the construction of new maintenance and logistics facilities and upgrades to infrastructure to support the future maritime force, including larger offshore patrol vessels.

Pending PWC approval.

Milestone:

Construction commence

Arafura Resources - Nolan's Rare Earths Project

$1.006 billion - Mining

Nolan’s is one of the world’s largest and most intensively explored rare earths deposits, sufficient to support mining and processing operations for more than 30 years.

Project includes a mine, beneficiation plant, extraction plant, separation plant and related infrastructure to be constructed on Aileron Station, approximately 135kms north west of Alice Springs.

Jobs: 870 jobs supported

Milestone:

Pending final investment decision Q3 2020

Arnhem Space Centre

$10 million (stage 1) - Other

Equatorial Launch Australia is developing a commercial spaceport south west of Nhulunbuy, with a sub-orbital rocket launch facilities.

NASA will use the Arnhem Space Centre for its sounding rocket program in 2020.

Jobs: 10 jobs during construction

Milestone:

Construction commence

Barossa Gas Field Development

$7 billion - Oil and gas

The Barossa Project is a gas and light condensate field located offshore about 300kms north of Darwin, Northern Territory.

Barossa would ensure continued operation of the Darwin LNG facility for a further 20+ years, providing ongoing economic and social benefits to Darwin.

Milestone:

Pending final investment decision

Central Arnhem Road Rolling Program

$225 million - Roads and transport

The Central Arnhem Road is a 710km road connecting Katherine via the Stuart Highway to Nhulunbuy.

The route links Nhulunbuy to the National Network, services a large number of Aboriginal communities and is a key tourism drive and freight route for the mining and pastoral industries.

The Central Arnhem Road Upgrade will involve sealing, reconstructing, widening, and flood immunity improvements to priority sections of the route to a fit-for-purpose standard.

Jobs: First package - 27 jobs supported

Milestone:

Commence

Explosive Ordnance Defence Facility

$19 million - Defence

A new purpose-built explosive ordnance storage facility in Darwin.

Comprehensive purpose-built logistics facility to increase the explosive ordnance storage and handling capability.

Milestone:

Construction complete

Darwin CBD Revitalisation

$200 million - City deals

Multiple projects to position Darwin as a vibrant and liveable tropical city.

New education and civic precinct with Charles Darwin University city campus, redeveloping State Square, an Urban Living Lab, preserving and promoting Larrakia culture through a host program and Larrakia Cultural Centre.

Jobs: 385 jobs supported per year - direct and indirect

Milestone:

Early works commence

Darwin LNG Life Extension

$600 to $900 million - Oil and gas

Extend the operational life of the Darwin LNG facility for another 20+ years.

Up to 24 months of refurbishment and related work to extend the operational life of the facility for another 20+ years.

Milestone:

Pending final investment decision

Delamere Range RAAF Upgrades

$176 million - Defence

Major facilities upgrade to the Delamere Air Weapons Range.

Upgrades include enhanced accommodation, recreation and messing facilities, operations centre, briefing room and explosive ordnance storage areas.

Milestone:

Construction complete

Core Finniss Lithium Project

$73 million - Mining

The flagship Finniss Project lies within one of the most prospective areas for lithium in the Northern Territory, the Bynoe pegmatite field, and covers over 500 square kilometres of granted tenements.

The company is proposing to develop one of Australia’s highest-grade lithium resources at the Grants Deposit.

The project has substantial infrastructure advantages; being close to grid power, gas and rail and within easy trucking distance by sealed road to Darwin Port - Australia’s nearest port to Asia.

Jobs: 150 jobs during construction, 90 jobs ongoing

Milestone:

Construction commence

Kakadu National Park and Future of Jabiru

$351.7 million - Hospitality and tourism

Transitioning Jabiru to a post-mining future as tourism and service delivery hub for the Kakadu and West Arnhem regions.

Construction of a new power station, Bininj Resource Centre, Government Services Hub, education precinct and health clinic in Jabiru, as well as remediation works of the town.

Furthermore, upgrades to key infrastructure such as roads, sewerage, water, landfill, local roads throughout Jabiru as well as airport airstrip and facilities.

Milestone:

Infrastructure investment

Katherine Logistics and Agribusiness Hub

$30 million allocated for the project - Agriculture

Construction of a fully operational, multi-disciplined logistics and agribusiness hub to meet the current and future growth needs of Katherine, the Top End region and northern Australia.

Katherine is an important regional centre supporting the cattle and horticulture industries and servicing the surrounding communities.

The town is a natural transport crossway connecting the Ord River and the Kimberley to the west, Alice Springs to the south and Queensland to the east.

Jobs: Stage 1 - 215 jobs during construction, 174 jobs ongoing

Milestone:

Headworks commence

Keep River Plains Road

$68 million - Roads and transport

The Keep River Road connects the planned Project Sea Dragon and agricultural activities in Ord stage 3 to processing facilities in Kununurra and export facilities at the Port of Wyndham.

The project will provide increased route accessibility to support the planned Project Sea Dragon and Ord stage 3 developments.

Improved freight capacity, through sealing of existing pavements, improved flood immunity, through provision of new bridges over the Keep River and Sandy Creek and increased regional productivity and economic development, through provision of year-round road access.

Jobs: 150 jobs for both stages

Milestone:

Road upgrade complete

Jervois Base Metal Mine

$216 million - Mining

KGL’s Jervois Base Metal Project is located on the Jervois Pastoral Lease, approximately 270km east-northeast of Alice Springs along the Plenty Highway.

The project involves both open cut and underground mining of a number of orebodies with onsite processing of ore via a flotation plant to produce metal concentrates.

The project plans to produce a copper / gold / silver concentrate and a lead / zinc concentrate estimated at 150,000 tonnes of total concentrate per annum over an estimated 12 to 15 year production life.

Milestone:

Pending final investment decision

Litchfield National Park Upgrades

$17.5 million (both stages) - Hospitality and tourism

Developing new visitor sites at three locations in Litchfield National Park, including roadworks will create jobs and support tourism.

Stage 1 upgrades include the construction of approximately 18km of unsealed road and tracks suitable for 4WD vehicles from Litchfield Park Road to the new swimming holes.

These upgrades will lead the way for stage 2 - construction of infrastructure at the site of the new swimming holes including campgrounds, walking and mountain bike trails, viewing platforms, picnic areas and car parking.

Jobs: 96 jobs - direct and indirect

Milestone:

Stage 2 construction start

Litchfield Park Road Upgrade - Stage 2

$26 million - Roads and transport

Sealing of the last 12kms of Litchfield Park Road to complete the loop around Litchfield National Park.

These works also include the construction of a bridge over the Lower Finniss River.

Litchfield Park Road has been progressively upgraded and sealed over a number of years to improve flood immunity, road safety and increase access for remote communities and towns in Litchfield Park and surrounds.

Jobs: 215 jobs supported

Milestone:

Construction complete

Mango Roads

$21 million - Roads and transport

Upgrading a 15km network of roads used by mango farmers to help protect fruit quality for consumers and improve profits for growers.

The project will seal four sections of road in the Litchfield municipality:

  1. Chibnall Road between Old Bynoe and Leonino Road (5.4km)
  2. Mocatto Road between Whitstone and Acacia Gap Road (3.2km)
  3. Horsnell Road between Elizabeth Valley Road and Alverly (3.4km), and
  4. Kentish Road between Hopewell Road and the end of the current sealed section (3.2km).

Milestone:

First tender release

Manunda Place Office Tower

$75 million - Other

A new nine-story office tower which will house Department of Health staff.

The building’s architecture will feature an internal atriums, a five-star energy efficiency rating, a rooftop garden and shading and greening at street level to help reduce heat loads in the CBD.

Jobs: 250 during construction

Milestone:

Construction complete

Mt Todd Gold Mine

$1.19 billion - Mining

A new gold mine in the Northern Territory.

The Mt Todd mine site is located approximately 50km north of Katherine and 250km south of Darwin.

The site covers a mine tenement of more than 153,700ha, which includes both the Batman and Quigley's gold deposits.

Jobs: 850 jobs supported

Milestone:

Final investment decision 2020
Construction commence

Project Sea Dragon Prawn Farm

Pending final investment decision - Agriculture

A world-class aquaculture business to produce more than 10,000 tonnes of prawns per year.

Project Sea Dragon is centred on a grow-out facility at Legune Station in the Victoria River District of the Territory.

Other elements include a quarantine facility and a processing facility in Western Australia, with a core breeding centre, a broodstock maturation centre and a commercial hatchery located near Darwin.

Jobs: 1,300 in construction and operations

Milestone:

Construction commence

Port Keats Road Saddle Rail Crossing

$23 million - Roads and transport

The project involves the upgrading of 11kms of Port Keats Road (from Yellow Creek Crossing to Saddle Rail Crossing).

The upgrade will improve flood immunity and provide better access to the communities, farms and mining operations to the west of Daly River in the Northern Territory.

Milestone:

Tender release

RAAF Base Tindal Redevelopment - Stage 6

$416 million - Defence

Updating and construction of new infrastructure at RAAF Base Tindal.

Upgrades to base infrastructure and trunk engineering services, replacing outdated facilities or equipment including living -in accommodation, power station, access roads etc.

Pending PWC approval.

Milestone:

Construction commence

Tanami Road Rolling Program

$200 million - Roads and transport

Tanami Road connects Alice Springs with Halls Creek in Western Australia.

Over two-thirds of Tanami Road is unsealed with substantial sections being unformed.

This surface has led to the development of significant ruts and corrugations from heavy vehicles.

These works will upgrade and improve flood immunity and resilience for the Tanami Road between the Stuart Highway north of Alice Springs, and the Great Northern Highway at Halls Creek.

Milestone:

Commence

Tellus Holding - Chandler Salt Mine

$676 million - Mining

The Chandler Salt Mine project includes a salt mine and waste storage facility in Central Australia.

The Chandler project is located in regional central Australia approximately 120km south of Alice Springs in the Simpson Desert and in the Amadeus Basin.

Chandler is Australia’s first proposed underground salt mine and deep geological waste repository in a 500-million-year-old halite (salt) bed.

Jobs: 720 jobs supported

Milestone:

Pending final investment decision 2022

TNG - Mount Peake

$824 million - Mining

The Mount Peake project, covering over 1,000 square kilometres in Central Australia, is emerging as one of the world’s largest new vanadium-titanium-iron projects.

The project will comprise an open cut mining operation and ore processing plant located in the southern central Northern Territory, approximately 280km north-northwest of Alice Springs.

Milestone:

Pending final investment decision

Toms Gully Gold Mine

$35 million - Mining

Gold mining at the historic Toms Gully mine site, approximately 100km southeast of Darwin.

Toms Gully mine site has high-grade resources and reserves of gold in the projects underground area.

Jobs: 270 jobs supported

US Defence Fuel Storage

US $62 million - Defence

Two 8ml fuel tanks to support US Force Posturing Initiative operations at RAAF Base Darwin.

Fuel storage facility at RAAF Base Darwin.

Milestone:

Construction commence

Zuccoli Primary School - Stage 2

$25 million - Other

A new government primary school in Zuccoli.

Fast tracking stage 2 of the new school will support the significant residential growth in the area.

Jobs: 160 jobs - direct and indirect

Milestone:

Construction complete

2021

Air 7000 Facilities and Infrastructure - RAAF Base Darwin

$161 million - Defence

Deliver facilities, infrastructure and airfield works for the introduction of the P-8A Poseidon aircraft.

The proposed facilities include maintenance hangars, workshops, aircraft pavements and associated engineering services.

Milestone:

Construction commence

Airfield Works - RAAF Base Tindal

$702 million - Defence

Airfield works at RAAF Base Tindal including new facilities and aprons/runways to support US Force Posturing Initiatives and KC30A tankers.

Works include runway extensions and strengthening, upgrades of taxiways, new air movement terminal, new aircraft aprons, new fuel farm and associated other infrastructure services.

Pending PWC approval.

Milestone:

Construction commence

Coogee Methanol Facility

$500 million - Oil and gas

Construction and operation of a methanol plant at Darwin’s Middle Arm.

Three hundred and fifty thousand tonne per annum methanol plant. Methanol is one of the most widely used chemicals uses including as a fuel additive and in the manufacture of products such as textiles and pharmaceuticals.

Jobs: 1,000 jobs during construction, 350 jobs ongoing

Milestone:

Targeting front-end engineering and design 2020
Potential final investment decision 2021

Darwin Clean Fuels Condensate Processing Plant

$1.2 billion capex - Oil and gas

Development, construction and operation of a condensate processing plant to produce transport fuels at Darwin’s Middle Arm.

Darwin Clean Fuels is partnering with McDermott - a major US-based technology, engineering procurement and construction company - to develop, construct and operate a 60,000 to 100,000 barrels per day condensate processing facility to supply transport fuels for the Northern Territory and Australia’s east coast.

Jobs: 400 jobs during construction, 140 jobs ongoing

Milestone:

Targeting front-end engineering and design 2020
Potential final investment decision 2021

Defence Health Facility Upgrades

$14 million - Defence

New Larrakeyah Health Centre and refurbishments to Robertson Health Centre.

New Larrakeyah Health Centre will include administration, primary care, inpatient unit, pharmacy, physiotherapy, dental, general support, and external works. Refurbishments to the Robertson Health Centre include the mental health area, physiotherapy, inpatient and administration areas, and the dental clinic.

Milestone:

Construction complete

Defence Radar Network Upgrades

$61 million - Defence

Jindalee Operational Radar Network facilities upgrades.

The project will delivery facilities and infrastructure upgrades to the two sites in the Northern Territory: Mount Everard and Harts Range.

Milestone:

Construction complete

Eastern Leases Manganese Mine

$160 million - Mining

Development of a manganese mine on Groote Eylandt.

Manganese ore from the project is proposed to be blended with manganese ore from the existing mine. This will extend the life of the existing mine and continue to provide significant socio-economic benefits to the local community as well as the regional economy of the Northern Territory.

Jobs: 90 jobs supported

Milestone:

Construction commence

John Stokes Square Redevelopment

$45 million - Housing and residential

This project includes the redevelopment of public housing accommodation, a new 24 hour police station, pedestrian safety upgrades and activated open space in the Darwin suburb of Nightcliff.

This redevelopment will improve quality of housing for seniors and people living with disabilities, allow for new amenities and open spaces, and reduce anti-social behaviour in the area.

Jobs: 250 jobs during construction

Milestone:

All projects completed

McArthur Basin and Beetaloo Sub-Basin, Exploration and Appraisal

Not disclosed - Oil and gas

Pangaea, Santos, Origin

Unconventional hydrocarbons

Milestone:

Demonstrate commercial recovery

MQ4C Triton Forward Operating Base - RAAF Base Tindal

$201 million - Defence

New facilities to support the MQ4C Triton unmanned forward operating base at RAAF Base Tindal.

Facilities will include maintenance hangars, aircraft aprons, warehousing and training support facilities.

Pending PWC approval.

Milestone:

Construction commence

Palmerston Regional Fire Response Service Complex

$25 million - Other

A new fire station in Palmerston.

The project will meet the growing demands for responsive fire services to the Palmerston and Coolalinga regions.

Jobs: 140 jobs - direct and indirect

Milestone:

Construction complete

Singleton Horticulture Project

$100 million - Agriculture

Develop 4000ha greenfield horticultural project.

Horticultural development proposal for growing a mix of irrigated perennial, broad acre and annual crops.

Jobs: 600 jobs ongoing

Milestone:

Project developed over six to eight years

US Defence Aprons and Tarmac - RAAF Base Darwin

US $24 million - Defence

New apron and tarmac facilities to support US Force Posturing Initiatives on RAAF Base Darwin.

Expansion of the aircraft parking apron and supporting facilities.

The expansion includes additional airfield rated concrete paved parking spots with asphalt shoulders, installation of additional type III fuel hydrant pits, and relocation of existing fuel isolation valve pits.

Additional work includes the installation of airfield ground lighting, storm water collection and treatment system, jet blast deflectors and construction of an asphalt access drive.

Milestone:

Construction complete

United States NT Training Areas and Ranges

$514 million - Defence

Construction and refurbishment across a number of Defence training range sites to support the US Force Posturing Initiatives.

Construction includes improvements at the Robertson Barracks Close Training Area, Kangaroo Flats Training Area, Mount Bundey Training Area, and Bradshaw Field Training Area.

Pending PWC approval.

Verdant Minerals - Ammaroo Phosphate

$1.4 billion - Mining

The Verdant Minerals project will be one of the largest phosphate mines in the country, supplying Asian markets via the Darwin Port.

The Ammaroo Phosphate Project, located 270kms north-east of Alice Springs, aims to produce more than two million tonnes of rock phosphate annually.

Jobs: 700 jobs in construction, 200 jobs in operations

Milestone:

Pending final investment decision

2022

Adelaide River Floodplain Upgrade

$54.2 million - Roads and transport

Upgrading 6.5kms of the Arnhem Highway.

The upgraded section of the highway will be built next to the existing road alignment, which will include raising the height of the road and drainage structures (13 bridge structures) along the new alignment.

Jobs: 427 jobs during construction

Milestone:

Expected completion

Jabiru Luxury Resort

$40 million - Hospitality and tourism

Luxury lodge accommodation including a spa on the redeveloped lake in Jabiru.

One hundred room luxury resort.

Milestone:

Final investment decision
Construction commence

Luxury Accommodation - 84 Mitchell Street

$150 million - Hospitality and tourism

A new 38-storey luxury accommodation building on Mitchell Street.

The proposal includes the construction of a new building on the site of the current Poinciana Motel, at the corner of Mitchell and McLaughlin Street.

Jobs: 200 jobs during construction

Milestone:

Pending final investment decision

Mandorah Marine Facilities

$50 million - Roads and transport

A new marine facility in Mandorah.

The Mandorah Jetty is ageing and a new facility is required for improved safety and to unlock development and tourism in the area.

Jobs: 80 jobs supported

Milestone:

Construction complete

National Airfields Capability Works - Darwin

$180 million - Defence

Upgrades to the airfields at RAAF Base Darwin and Tindal.

The proposed works include a new sensor equipment building, construction of a new air traffic control tower and refurbishment and modifications to the airfield systems complex facilities at RAAF Base Darwin and Tindal.

Milestone:

Construction commence

Westin Hotel

$200 million for hotel - Hospitality and tourism

Luxury hotel at Darwin Waterfront Precinct.

Tropical hotel will embody the rich natural and cultural heritage of the Northern Territory.

The hotel overlooking the Darwin Harbour and adjoining the CBD will provide a significant boost for the local tourism industry, and act as a major drawcard for high-end business people and more tourists.

Jobs: 500 in construction, 150 in operations

Milestone:

Construction complete

2023

2024 onwards

Last updated: 29 January 2020